Thursday, November 12, 2020

Shower and Shelves and Tile, Oh my!

It is starting to come together!  Time seems to have been at a stand still for days at a time, but we are finally seeing progress.  I am weary and thankful that the end is in sight.  My house is covered with tarps and dust and I am SO ready to have our space back.

The biggest progress made has been:

Shower install.  You may remember that we had a monstrous Jacuzzi tub in this space.  Out with the old...


In with the new!  Waiting still for the glass doors to come in, but then that will be DONE!  In that project, the title floor was put back in.  Eventually I would like to replace the tile with wood and replace the vanity countertop, but that is a project for another time.  I will be painting the walls a light grey, hopefully next week!

 



Shelves- My awesome hubby made these shelves for above the sink area in our kitchenette.  Yes, I did at least help stain them.  And supervise the hanging.  I am getting to be a good supervisor!  Just ask him, haha!





 

Kitchen tile backsplash.  While there is no stove top down here, we do have a sink and so we wanted to protect the wall from splashes.  I love how it turned out.  It just gives it a clean, finished look.  Floors finally went in and once the trim is in place again we can roll the fridge in.  It is currently in the middle of the room!

 



Lovely, huh?!
 

Kitchen floors- This is by far my favorite thing that happened!  I LOVE these floors and cannot wait to replace all of the remaining tile in the house with them.  Maybe spring?!

 

 



This week- trim back in place and clean up.  A lot of cleanup.

Almost there and just in time!  My mom is coming to visit in a few days!  Because of COVID restrictions we haven't seen her since last Christmas and she decided no more!!  Can't wait to have her here to celebrate Salem's birthday, her birthday, and Thanksgiving with us!

Blessings,

Tuesday, October 20, 2020

Slow Going

I mean slow!  Actually, through the professional's eyes, lots of little steps have been done.  You have to do those things first, of course.  Through my eyes, it is a S-l-o-w process.  I am, indeed, not a professional!

But the two big things my non professional self knows are the drywall and painting are done, which means our new hall connecting the guest room and bath is in, minus the door...





Ready for the shower to be built!


and the cabinets and countertop are in!

Before prep

Fridge will go on the left once floors are in


Can't wait to take all that plastic down!  It's not helping with dust control anyway!

And I am ready to decorate!

OK, ready and able are two different things you know!  I am biting at the bit to pull things in but Clarke and common sense are making me wait.  Mostly Clarke!

There is going ot be about a week lull while we wait for the first step in the shower install to happen and then tile backsplash and tile floor will be completed.  Then about another week lull for the flooring to be complete in the kitchen.  

I do not like lulls!

In the meantime, I am hoping that Clarke and I will be able to install the floating shelves above the sink this weekend.  Fingers crossed.

And speaking of lulls, part of this project also included adding electric on the outside side of the kitchen wall so we could have a hot tub installed.  While we miss our pool, a hot tub was really the only feasible answer to our location and we were looking forward to having it the first of November.  That being said, it is delayed another 3-4 weeks.  Who knew COVID would delay hot tub production!?!

First world problems, but annoying none the less to this tired-of-waiting for EVERYTHING lady!  I feel for anyone who is currently building a home and starting from scratch.  Hats off to you!